A central processing unit for medical devices (AEMP) is to be set up in the building of the former central kitchen on the Berg Clinic.
The essential requirements for the performance "Indoor Air Technology" can be found under point s. II.2.4).
- 2 supply air systems 22 500 m
- 2 drainage systems 20,000 m
- 2 hydraulic switches;
- 1 400 m
- 1 200 m
- 12 pcs exhaust fans;
- 17 pieces fire damper round DN100-DN200;
- 11 x square fire damper.