Renovation of the building of the former wall Albert secondary school, Prüm Lot 43 transformer 1 transformer compact station 630 kVA 20kV/0.4kV 1 foundation for transformer station 12 m² 60m Create cable trench in embankment Dismantling and disposal of existing medium voltage system 3 pcs Dismantling and disposal of existing oil transformers (not contaminated)
Lot 43 Transformer 1 Transformer Compact Station 630 kVA 20kV/0.4kV 1 Foundation for transformer station 12 m² 60m Create cable trench in embankment Dismantling and disposal existing medium voltage system 3 pcs. Dismantling and disposal of existing oil transformers (not contaminated with harmful substances)