The subject of the contract is the reconstruction of the water supply network along with connections to buildings within the existing road lane of Piłsudskiego Street in Zakopane.
Reconstruction of the water supply network along with connections to buildings within the existing road lane of Piłsudskiego Street in Zakopane.Task I – The scope of the contract includes the reconstruction of the network and water supply connections with a total length of 284.32 m, including:
PE Ø 90 mm : 4.97 mb
PE Ø 50 mm : 30.22 mb
PE Ø 40 mm : 134.29 mb
PE Ø 32 mm : 114.84 mb