BA 1
270 m² clearing of small trees and shrubs
160 m³ of soil excavation
998 m² Geländeprofilierung
1,200 m² paving and slab pavement
290 m one-liner
1,490 m edging steel strip
280 m² Schotterrasen
890 m² seepage and filter layers
1.100 m² Tragschichtbewehrung
70 m Dränleitung
120 m drainage / façade gutter
Deliver and plant 600 climbing plants
720 m² (lean) lawn / gravel lawn sowing
370 m² planting of perennials and small shrubs
50 m Viereckdrahtgeflechtzaun
In addition to the necessary disposal work
BA 2
50 m² clearing of small trees and shrubs
1,200 m² demolition of paving and slab pavements
775 m² paving and slab paving
80 m of one/two-liner natural stone
60 m edging steel strip
850 m² Tragschichtbewehrung
80 m storm sewer
10 m drainage / façade gutter
30 m Baumbelüftung
1 St Baumpflanzung
55 m² planting of perennials and small shrubs
29 m Aufstockungsrahmen
18 St Lichtschachtabdeckungen
40 m Natursteinsitzbank
Landscaping work BA 1
270 m² Clearing of small shrubs/ground cover or clearing grass-herbaceous growth incl. pushing Ground cover with roots and topsoil excavation
160 m³ of soil excavation
998 m² terrain profiling under mass balancing
1,200 m² of paving and slab pavements or surface fills including superstructure work / cutting work
290 m one-liner, natural stone, granite or curbstone, concrete (HB)
1,490 m edging steel strip
280 m² Schotterrasen
890 m² seepage and filter layers on substructure surfaces
1.100 m² Tragschichtbewehrung Geogitter
70 m drainage pipe incl. seepage pack / rainwater sewer
120 m drainage / façade gutter, 4 courtyard drains
Deliver and plant 600 climbing plants incl. mulching and substrate work
720 m² (lean) lawn / gravel lawn sowing
370 m² planting of perennials and small shrubs incl. undersowing / mulching and substrate work
50 m square wire mesh fence H 2.0 m incl. 1 swing gate l.W. 7.0 m
In each case, plus the necessary disposal work and finishing maintenance.
Landscaping work BA 2
50 m² clearing of small shrubs/ground cover or clearing grass and herbaceous growth incl. pushing Ground cover with roots and topsoil excavation
1,200 m² demolition of paving and slab pavements or surface fills including base courses and edgings
775 m² paving and slab pavements or surface fills incl. superstructure work / cutting work
80 m one/two-liner natural stone granite
60 m edging steel strip
850 m² Tragschichtbewehrung Geogitter
80 m storm sewer
10 m drainage / façade gutter, 5 courtyard drains
30 m Baumbelüftung
1 pc tree planting incl. tree anchoring and evaporation protection
55 m² planting of perennials and small shrubs incl. gravel mulching and substrate work
29 m extension frame light shaft galvanized steel
18 pcs light well covers / connecting bar grating 30/10
40 m natural stone bench incl. foundation
In each case, plus the necessary disposal work and finishing maintenance.