The client intends to renovate and renew the wave pool in the salt spa Lüneburg. As part of the construction project after the disassembly of equipment and facilities of interior work and after the disposal of hazardous substances, the demolition of structural components and a concrete restoration carried out, in the connection then the structure is followed. The roof sealing works are advertised here.
The roof sealing works are written out in accordance with the specifications.