B 3, Entl. KNP B 3/L 80alt in Sinzheim, part line.
In this construction phase, the gap closure of the B 3 is produced on a clear route. The route runs along the existing rail entertainment path. The B 3 is manufactured in full expansion, with the substructure of DB AG's old construction road being used.
In addition, a parallel economic route and a plant wastewater treatment plant will be built at the Steckenmattgraben.
Along the economic route, amphibian control facilities are also being built north and south of the Steckenmattgraben.
— top floor removal approx. 4 600 m
— loosen the floor approx. 4 850 m
— perform soil improvement approx. 12 600 m
— install embankment approx. 6 100 m
— antifreeze layer produce approximately 4 600 m
— asphalt foundation layer produce approximately 9 450 m
— asphalt surface layers produce approximately 11 650 m
— Amphibian control equipment produce approx. 320 m.