1. The subject of the contract is the expansion of the research platform for artificial intelligence work – divided into 3 parts. The contracting authority requires the delivery, installation, configuration, and maintenance of the research platform for artificial intelligence work, which will enable simultaneous computing on at least 96 GPU units, each equipped with no less than 250GB of RAM.
The basic order - according to the following summary:
Part No. 1 – Server Hardware
1) Integrated AI computing cabinet equipped with computing servers with at least 8 GPU cards each
(detailed requirements described in point 5.1 SOPZ) - 2 pcs.
2) Server cabinet with RHDX exchanger
(detailed requirements described in point 5.2 SOPZ) - 1 pc.
3) Software for central management of servers from point 1
(detailed requirements described in point 5.3 SOPZ) - 1 pc.
Part No. 2 – Expansion of AI Data Storage System (weka.io)
4) allFlash NVME storage server compatible with weka.io (detailed requirements described in point 5.4 SOPZ) - 6 pcs.
Part No. 3 – Network Hardware
5) Ethernet switch for AI computing
(detailed requirements described in point 5.5 SOPZ) - 4 pcs.
6) Ethernet switch 100/400Gb (detailed requirements described in point 5.6 SOPZ) - 2 pcs.
7) Ethernet mgmt switch (detailed requirements described in point 5.7 SOPZ) - 3 pcs.
2. Detailed Description of the Subject of the Contract is contained in Annex No. 1 to the SWZ.
LOT-0001
ZZOSE.2611.27.2026.415.MPU[GPULAB26], part 1
Part No. 1: Server Hardware.
1. The subject of the contract is the expansion of the research platform for artificial intelligence work – divided into 3 parts. The contracting authority requires the delivery, installation, configuration, and maintenance of the research platform for artificial intelligence work, which will enable simultaneous computing on at least 96 GPU units, each equipped with no less than 250GB of RAM.
The basic order - according to the following summary:
Part No. 1 – Server Hardware
1) Integrated AI computing cabinet equipped with computing servers with at least 8 GPU cards each
(detailed requirements described in point 5.1 SOPZ) - 2 pcs.
2) Server cabinet with RHDX exchanger
(detailed requirements described in point 5.2 SOPZ) - 1 pc.
3) Software for central management of servers from point 1
(detailed requirements described in point 5.3 SOPZ) - 1 pc.
Part No. 2 – Expansion of AI Data Storage System (weka.io)
4) allFlash NVME storage server compatible with weka.io (detailed requirements described in point 5.4 SOPZ) - 6 pcs.
Part No. 3 – Network Hardware
5) Ethernet switch for AI computing
(detailed requirements described in point 5.5 SOPZ) - 4 pcs.
6) Ethernet switch 100/400Gb (detailed requirements described in point 5.6 SOPZ) - 2 pcs.
7) Ethernet mgmt switch (detailed requirements described in point 5.7 SOPZ) - 3 pcs.
2. Detailed Description of the Subject of the Contract is contained in Annex No. 1 to the SWZ.
LOT-0002
ZZOSE.2611.27.2026.415.MPU[GPULAB26], part 2
Part No. 2 – Expansion of AI Data Storage System (weka.io).
1. The subject of the contract is the expansion of the research platform for artificial intelligence work – divided into 3 parts. The contracting authority requires the delivery, installation, configuration, and maintenance of the research platform for artificial intelligence work, which will enable simultaneous computing on at least 96 GPU units, each equipped with no less than 250GB of RAM.
The basic order - according to the following summary:
Part No. 1 – Server Hardware
1) Integrated AI computing cabinet equipped with computing servers with at least 8 GPU cards each
(detailed requirements described in point 5.1 SOPZ) - 2 pcs.
2) Server cabinet with RHDX exchanger
(detailed requirements described in point 5.2 SOPZ) - 1 pc.
3) Software for central management of servers from point 1
(detailed requirements described in point 5.3 SOPZ) - 1 pc.
Part No. 2 – Expansion of AI Data Storage System (weka.io)
4) allFlash NVME storage server compatible with weka.io (detailed requirements described in point 5.4 SOPZ) - 6 pcs.
Part No. 3 – Network Hardware
5) Ethernet switch for AI computing
(detailed requirements described in point 5.5 SOPZ) - 4 pcs.
6) Ethernet switch 100/400Gb (detailed requirements described in point 5.6 SOPZ) - 2 pcs.
7) Ethernet mgmt switch (detailed requirements described in point 5.7 SOPZ) - 3 pcs.
2. Detailed Description of the Subject of the Contract is contained in Annex No. 1 to the SWZ.
LOT-0003
ZZOSE.2611.27.2026.415.MPU[GPULAB26], part 3
Part No. 3 – Network Hardware.
1. The subject of the contract is the expansion of the research platform for artificial intelligence work – divided into 3 parts. The contracting authority requires the delivery, installation, configuration, and maintenance of the research platform for artificial intelligence work, which will enable simultaneous computing on at least 96 GPU units, each equipped with no less than 250GB of RAM.
The basic order - according to the following summary:
Part No. 1 – Server Hardware
1) Integrated AI computing cabinet equipped with computing servers with at least 8 GPU cards each
(detailed requirements described in point 5.1 SOPZ) - 2 pcs.
2) Server cabinet with RHDX exchanger
(detailed requirements described in point 5.2 SOPZ) - 1 pc.
3) Software for central management of servers from point 1
(detailed requirements described in point 5.3 SOPZ) - 1 pc.
Part No. 2 – Expansion of AI Data Storage System (weka.io)
4) allFlash NVME storage server compatible with weka.io (detailed requirements described in point 5.4 SOPZ) - 6 pcs.
Part No. 3 – Network Hardware
5) Ethernet switch for AI computing
(detailed requirements described in point 5.5 SOPZ) - 4 pcs.
6) Ethernet switch 100/400Gb (detailed requirements described in point 5.6 SOPZ) - 2 pcs.
7) Ethernet mgmt switch (detailed requirements described in point 5.7 SOPZ) - 3 pcs.
2. Detailed Description of the Subject of the Contract is contained in Annex No. 1 to the SWZ.