A281 BL4.0 Tunnel, Prestressed Concrete Bridge, Route
DEGES Deutsche Einheit Fernstraßenplanung- und -bau GmbH is planning the construction of the A281, VKE B021, BA2/2 motorway motorway between Airport-Stadt and AS Kattenesch / Huckelriede.
New construction to close the gap between Airport-Stadt and AS Kattenesch / Huckelriede with
• Elevated road with a length of approx. 370 m
• Track construction with a length of approx. 985 m
• West trough structure with a height of approx. 272 m
• Tunnel blocks 1 - 4 with a length of approx. 40 m
• Untergrundverbesserung
masses:
• Reinforcing steel approx. 6,150 t
• Concrete ca.61.300 m3
• Konstruktionsstahl ca. 450 t
• Spundbohlen ca. 23.000 m2
• Walzprofile ca. 315 t
• Stabstahl ca. 415 t
• Aluminium approx. 55 t
• Asphalt approx. 9,450 m3
• Sandeinbau ca. 116.800 m3
• Plastic pipelines approx. 5,826 m
• Concrete pipelines approx. 840 m
• Kabelschutzrohre ca. 4.700 m
• Frostschutzschichten ca. 3.415 m3
• Tragschichten ca. 14.600 m3
• unbound surface courses approx. 14,300 m2
• Pflasterdecken ca. 3.630 m2
• Curbs approx. 3,870 m