Basic repair of the Wakenitzbrücke,
Repair of the underside of the structure (superstructure underside and substructures) in 2 sections Concrete repair according to ZTV-ING parts 3-4, 3-5.
Concrete repair in accordance with ZTV-ING Part 3 Section 4 and Section 5 of the underside of the structure (superstructure underside and substructures)
- approx. 7 100 m
- about 12 800 m
Renewal of approx. 500 m of drainage pipes;
Scaffolding work - on pontoons in the area of the Wakenitz - from the ground level traffic safety work.