Architectural, construction, engineering and inspection services | Tenderlake

Architectural, construction, engineering and inspection services

Contract Value:
EUR 7M - 7M
Notice Type:
Contract Notice
Published Date:
21 October 2022
Closing Date:
15 November 2022
Location(s):
DE80N Vorpommern-Greifswald (DE Germany/DEUTSCHLAND)
Description:
New construction of Regenbogen day-care centre in Greifswald / Specialist planning Building physics - thermal insulation and energy balancing

The own company "Hanse-Kinder" of the University and Hanseatic City of Greifswald intends to build the new regenbogen daycare center on the area of parcel 11/95 in corridor 11 in Greifswald. The day care center "Regenbogen" is located in the district Schönwalde I and was built in 1973 in prefabricated construction. Now this building is to be replaced by a functional energy-efficient new building with 153 places, of which 48 crèche and 105 kindergarten places. The daycare centers of the in-house operation "Hanse-Kinder" work according to the needs-oriented approach according to the principle of open work. The spatial structures must in principle be suitable for open work. Life cycle costs are an important basis for decision-making during the planning process. Here, different variants are to be examined and differences in costs between construction and operation as well as between different energy standards are to be presented. The building must be planned and constructed according to the principles of sustainable construction and should achieve at least 65% overall degree of fulfilment according to the NBB or DGNB as a target.

Building Physics - Thermal Insulation and Energy Balancing according to Performance Profile Building Physics HOAI 2013 Annex 1, 1.2.1 (2):

New construction of the Regenbogen day care centre 1st BA HZ III, minimum rate, acc. to HOAI, Anl. 1, Section 1.2.3, LPH 1-8 Auditing/Coordination of Sustainable Building:

The planning and construction of the day-care centre is to be carried out taking into account the evaluation criteria according to BNB or DGNB; the projects must be consistently measured against the corresponding criteria until completion. At least one DGNB gold or one BNB silver standard is to be implemented. Required service components are:

- Description of the requirements for planning and execution according to sustainability criteria and development

a target agreement according to the applicable system variant or the applicable usage profile - establishment of a management system that integrates a certification of sustainability into the construction process,

including fixation of interfaces, responsibilities, deadlines and processes - Continuous updating of the sustainability assessment as well as coordination and control of the

Verification from execution planning to completion Assessment status - Preparation of life cycle assessments (LCA) to an appropriate extent, including advice to the technical participants

- Determination of life cycle costs (LCC) including consideration of variant investigations in

Appropriate scope and advice to the technical parties involved - creation of a component catalogue for the presentation and evaluation of all materials used

- Assistance in the integration of sustainability aspects in courses as part of the preparation and

Execution of awards - testing and approval of construction products before installation

- carrying out spot checks on an appropriate scale to ensure compliance with the

Sustainability requirements during construction - compilation of all verification documents/documentation and submission of project documents to the

Certification body including processing of queries or additional claims - organization and implementation of thermal room simulation, airtightness measurements as well as

Indoor air measurements (VOC) per building

Download full details as .pdf
The Buyer:
Universitäts- und Hansestadt Greifswald, Der Oberbürgermeister, Stadtbauamt
CPV Code(s):
71000000 - Architectural, construction, engineering and inspection services