Renovation and change of use of former hospital in Bad Säckingen, here: gas, water, sewage, fire extinguishing systems
The Health Campus Bad Säckingen GmbH is planning the renovation and conversion of the former Bad Säckingen hospital in Meisenhartweg 14 in 79713 Bad Säckingen. The Bad Säckingen hospital was put into operation in 1980 and renamed “hospital” in 2011 after a merger with the Bad Waldshut hospital. In November 2017, the district council decided to close the hospital on December 31, 2017 and to plan a health campus. Since then, with the exception of a cardiology practice and an accident practice, the hospital has been in
Ground floor completely empty.
On the ground floor, the construction of a medical center, on the 1st to 3rd floor, the conversion into a nursing home is planned. With this invitation to tender, the sanitary trade is tendered.