New indoor swimming pool in Moosburg ad Isar
Construction of an indoor pool:
- BRI: 13 600 m³,
- GFA: 2,725 m 2 ,
- pool: 12.50 mx 25 mx 1.80 m,
- 250 m site fence,
- 70 weeks maintenance of the construction fence,
- 300 m 3 Allowance for the expansion of roads and paths,
- 3 500 m 3 Compaction in layers,
- 1,980 m 3 In-situ concrete strip foundation unreinforced,
- 300 m 3 In-situ concrete floor slab,
- 920 m 2 Formwork outer wall bent, H 3-4 m,
- 800 m 2 Inner wall formwork Large-area formwork GF formwork pl. H 3-4 m,
- 175 m 2 Masonry inner wall D 11.5cm KS LR SFK12 RDK1.6 MGIIa.
Locksmith services.