Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is lot 21 - Thermal insulation (interior):
- 2048 sqm interior wall insulation system
- 748 sqm of compensation plaster, different thicknesses, soffits and wall surfaces
- 1338 m side insulation walls, 60 cm
- 628 m edge insulation ceilings, 60 cm
- 958 m soffold insulation up to 40 cm
- 3220 sqm reinforcement layer
- 2894 sqm of surface plaster
- 417 sqm doweling
- 908 m window connections
- 1310 m fabric corner protection
- 180 St Adapt to electrical insulation box
- 1 moisture calculation
- 3 heat bridge calculation