Digital mapping services | Tenderlake

Digital mapping services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 June 2019
Closing Date:
01 July 2019
Location(s):
FR10 Île de France (FR FRANCE)
FRB0 Centre – Val de Loire (FR FRANCE)
FRC BOURGOGNE-FRANCHE-COMTÉ (FR FRANCE)
FRD NORMANDIE (FR FRANCE)
FRE NORD-PAS DE CALAIS-PICARDIE (FR FRANCE)
FRF ALSACE-CHAMPAGNE-ARDENNE-LORRAINE (FR FRANCE)
FRG0 Pays de la Loire (FR FRANCE)
FRH0 Bretagne (FR FRANCE)
FRI1 Aquitaine (FR FRANCE)
FRI2 Limousin (FR FRANCE)
FRI3 Poitou - Charentes (FR FRANCE)
FRJ1 Languedoc-Roussillon (FR FRANCE)
FRJ2 Midi-Pyrénées (FR FRANCE)
FRK AUVERGNE-RHÔNE-ALPES (FR FRANCE)
FRL PROVENCE-ALPES-CÔTE D’AZUR (FR FRANCE)
Description:
Market of cartographic, topographic and detective controls

In the context of the security of its works and in order to meet the legal obligations, GRDF has set up cartographic production markets as part of the works of which it is the contracting authority, as well as georeferencing and resetting markets. plans, detection of existing gas works. The contract covers the controls of these services.


Lot 1: IDF

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.


Lot 2: North West

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.


Lot 3: is

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.


Lot 4: south east

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.


Lot: South West

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.


Lot 6: west center

- the control of topography work:

- on the planimetric and altimetric accuracy of the topographic surveys of the backgrounds,

- on the qualification of the precision of the georeferencing of a plane following a Helmert transformation,

- on the planimetric and altimetric accuracy of the topographic surveys of the networks,

- on the quality, completeness and coherence of the representation of the plan funds,

- the control of mapping work,

- compliance with V2 + and V3 standards,

- quality of the report of the works,

- compliance with assembly rules,

- inter-scale control,

- the control of the georeferencing of structures by detection of buried markers,

- the detection control of gas works.

Download full details as .pdf
The Buyer:
Gaz réseau distribution France — GRDF
CPV Code(s):
71354100 - Digital mapping services