Surface work for streets | Tenderlake

Surface work for streets

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 April 2019
Closing Date:
23 May 2019
Location(s):
PL711 Miasto Łódź (PL Poland/POLSKA)
Description:

The subject of the contract is the execution of construction works consisting in the renovation of the pavement of selected streets located in the city of Łódź.

A detailed description of the subject of the contract is included in the price forms of parts 1-14 (Forms 2a-2n) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.


Surface repair ul. Konopna together with pavements from ul. Szczecińska towards ul. Spadkowa

1. The scope of planned works includes the renovation of the road surface and pavement on ul. Konopna on the section from ul. Szczecińska towards ul. Downward.

2. A detailed description of the subject of the contract is included in the pricing forms of Part 1 (Forms 2a) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. of this Volume SIWZ and in Volume III SIWZ - Contract act form

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Road surface repairs ul. Gościniec from ul. Boczna towards ul. mosaic

1. Renovation of the road surface of Gościniec Street from ul. Boczna towards ul. mosaic

2. A detailed description of the subject of the contract is included in the Price Form (Form 2j) - Volume I of the ToR, in the Technical Specifications of Construction Works Performance and Acceptance - Volume II of the ToR and in Volume III of the Terms of Reference - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4.Requirements of employment by the Contractor or subcontractor based on the employment contract referred to in Art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Majowa and Nera

1. Task 1 - Repair of the surface ul. May

Task 2 - Repair of the surface ul. Nery

2. A detailed description of the subject of the contract is included in the Price Form (Form 2k) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4.Requirements of employment by the Contractor or subcontractor based on the employment contract referred to in Art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Neonowa and Anna Walentynowicz

1. Task 1 - Repair of the surface ul. Neonowa along with pavements

Task 2 - Renovation of the road surface and parking spaces ul. Anna Walentynowicz

2. A detailed description of the subject of the contract is included in the Price Form (Form 2l) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Renovation of the street Łukaszewska and Skrzatów

1. Task 1 - Repair of the surface ul. Łukaszewski

Task 2 - Renovation of the street Skrzatów - hardening the shoulders and parking spaces

2. A detailed description of the subject of the contract is included in the Price Form (Form 2m) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the SIWZ - Contract Act Form.

3.Ordering pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. of this Volume SIWZ and in Volume III SIWZ - Contract act form

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Cloud and Waterfall

1. Task 1 - Repair of the surface ul. cloudy

Task 2 - Repair of the surface ul. waterfalls

2. A detailed description of the subject of the contract is included in the Price Form (Form 2n) - Volume I of the ToR, in the Technical Specifications for the Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Piliczna along with pavements from ul. Platinum towards ul. of lynx

1. The scope of planned works includes the renovation of the road surface and pavement on ul. Pilicznej

On the section from ul. Platinum towards ul. Lynx.

2. A detailed description of the subject of the contract is included in the Price Form (Form 2b) - Volume I of the ToR, in the Technical Specifications of Construction Works Performance and Acceptance - Volume II of the ToR and in Volume III of the Terms of Reference - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities related to the implementation of the contract consisting in driving or operating road equipment be performed by at least 3 people employed by the Contractor or subcontractor under an employment contract

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Lithuanian

1. The scope of planned works includes the renovation of the road surface and pavement on ul. Lithuanian

2. A detailed description of the subject of the contract is included in the Price Form (Form 2c) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Podbiałowa along with pavements on the section from ul. Trawiasta to ul. herbal

1. The scope of planned works includes the renovation of the road surface and pavement on ul. Podbiałowa

On the section from ul. Trawiasta to ul. Herbal.

2. A detailed description of the subject of the contract is included in the Price Form (Form 2d) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Dereniowa and Mrówcza

1. Task 1 - Repair of the surface ul. Dereniowa along with pavements

The scope of planned works includes the renovation of the road surface and pavement on ul. Dereniowa.

Task 2 - Renovation of road surface ul. Mrówcza - continuation

2. A detailed description of the subject of the contract is included in the Price Form (Form 2e) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Zelwerowicz - continuation

1. The scope of planned works includes renovation of the pavement surface on ul. Zelwerowicz on the section from property No. 32 towards ul. Kopcińskiego.

2. A detailed description of the subject of the contract is included in the Price Form (Form 2f) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - the Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Requirements of employment by the Contractor or subcontractor based on the employment contract referred to in Art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Burzliwa from ul. Falista St. to ul. stormy

1. The scope of planned works includes the renovation of the road surface on ul. Burzliwa on the section from ul. Falista St. to ul. Stormy.

2. A detailed description of the subject of the contract is included in the Price Form (Form 2g) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the Terms of Reference - Contract act form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4.Requirements of employment by the Contractor or subcontractor based on the employment contract referred to in Art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Sportowa along with pavements on the section from ul. Horse to No. 10

1. Surface repair ul. Sportowa along with pavements on the section from ul. Horse to No. 10

2. A detailed description of the subject of the contract is included in the Price Form (Form 2h) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the activities in the field of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or a subcontractor on the basis of an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.


Surface repair ul. Jedwabnicza, Wild Fields and Summer Resort

1. Task 1 - Repair of the surface ul. Jedwabnicza from ul. Columns towards ul. mine

Task 2 - Repair of the surface ul. Wild Fields

Task 3 - Repair of the surface ul. Letniskowej from ul. Skrajna to ul. Świerszczyk

2. A detailed description of the subject of the contract is included in the Price Form (Form 2i) - Volume I of the ToR, in the Technical Specifications of Performance and Acceptance of Construction Works - Volume II of the ToR and in Volume III of the ToR - Contract Act Form.

3. Employer, pursuant to art. 29 paragraph 3a of the Act, requires that the performance of the contract consisting in driving or operating road equipment should be performed by at least 3 people employed by the Contractor or subcontractor under an employment contract.

4. Employment requirements by the Contractor or subcontractor on the basis of an employment contract referred to in art. 29 paragraph 3a of the Act, persons performing activities in the field of the contract are specified in item 3.6. Volume I SIWZ and in Volume III SIWZ - Contract act form.

The above requirements specify in particular:

a) the method of documenting the employment of persons referred to in art. 29 paragraph 3a of the Act,

b) the Awarding Entity's powers to control compliance of the contractor with the requirements referred to in art. 29 paragraph 3a of the Act and sanctions for failure to meet these requirements,

c) the type of activities necessary to perform the contract to which employment requirements relate, based on an employment contract by the contractor or subcontractor of the person performing the activities during the performance of the contract.

Download full details as .pdf
The Buyer:
Miasto Łódź - Zarząd Dróg i Transportu
CPV Code(s):
45233252 - Surface work for streets