The city of Nürtingen intends to completely renovate the Hölderlin grammar school in Nürtingen. The main building was built in 1978 as a South Education Center and expanded in 1981 by a two-storey extension (component D).
In 2007, a canteen was added to the building complex. Over the years, minor renovation measures were carried out on the buildings and a photovoltaic system was built on parts of the roof area. As part of the canteen extension in 2007 (meeting place), an elevator was added to the atrium of the main building.
The construction project will be carried out in two construction phases.
Worked Photovoltikanlage
approx. 195 pcs 15° base frame
ca. 20 to Ballastierung
approx. 420 m substructure for modular frames
approx. 181 pcs of solar modules
approx. 3 pcs inverter
approx. 60 m AC cabling
approx. 3 pcs 4-pole. Surge arresters in AP housing
approx. 1 pcs meter cabinet unit incl. removal