Demolition rough construction works, construction site equipment.
- Container system with 6 containers,
- 15 m high scaffolding tower with construction hoist,
- Complete demolition of the bed ward with a floor area of approx. 450 m
- Brandwanderstellung about 50 m
- 2 additional ceiling openings with injection reinforcement and concrete coating,
- wall door openings in the outer wall,
- various shell closures.