The project concerns the modernisation of four factory buildings at the ÜAZ Holleben Südstraße 4A site in 06179 Teutschenthal, each with four training units. At and in the four workshop buildings from 1995 with a total of 16 training units, there are structural and technical defects due to their age. In addition, the use of sanitary and changing areas is impaired. A reorganization is required.
The subject matter of the contract are services of technical equipment according to Part 4 Section 2 HOAI according to § 53 Abs. 2 HOAI, work phases 2-9 (step-by-step commissioning), plant groups 4 and 5.
The subject matter of the contract are services of technical equipment according to Part 4 Section 2 HOAI according to § 53 Abs. 2 HOAI, work phases 2-9 (step-by-step commissioning), plant groups 4 and 5. The project is a construction project funded by the Federal Ministry of Education and Research and the State of Saxony-Anhalt. Funding is provided on the basis of the "Joint Guidelines for the Promotion of Inter-Company Vocational Training Centres (ÜBS) and their Further Development into Competence Centres", the ancillary provisions for grants for project funding mentioned therein and taking into account the requirements of the Guideline for the Implementation of Funding Construction Measures (RZBau). Bau Bildung Sachsen-Anhalt e.V. is an educational service provider for the construction industry in the federal state of Saxony-Anhalt. The project is intended to modernise the four factory buildings at the ÜAZ Holleben site. The construction project is carried out during ongoing training operations. Therefore, it is necessary to carry them out in sections.
The following measures from KG 440 and 450 are required:
Heavy current systems:
- Renewal of the complete hall lighting with further use of the existing distributors and cabling
- Replacement of worn installation equipment (switches and sockets)
- Renewal of the emergency lighting of the escape and rescue routes
- Renewal of the lighting corridors and sanitary rooms with further use of the existing distributors and cabling
Telecommunications and information technology systems:
- Renewal of the fire alarm system and replacement of the hand detectors, loudspeakers against sirens
- In the course of processing, necessary measures on the data and communication network must be evaluated.
The four factory buildings are single-storey buildings without basements and have a total gross floor area (GFA) of 6,762.83 m² and a gross volume (BRI) of 36,857.16 m³. The estimated construction costs KG 300-400 are expected to be approx. 6,100,000 EUR/gross, of which approx. 570,000 EUR/gross are planned for KG 440-450 according to DIN 276.
A catalogue of measures and space programme confirmed by the funding bodies must be taken into account in further planning.
The provision of services performance phase 2 is expected to take place after commissioning from 01.03.2023 to 10.04.2023 and the services of performance phase 3 from 01.05.2023 to 31.08.2023.