This tender concerns 8-year revision of compressed air components for 18 trainsets and bogies for 19 trainsets. The trainsets are of the ‘ALSTOM Coradia Lint 41 Series 3’ type.
The first of 13 sets of compressed air components and the first 14 sets of bogies will undergo revision in the period 01.01.2024 – 30.04.2026. The last compressed air components and bogies will undergo revision in the period 01.04.2029 – 31.12.2029.
This tender concerns 8-year revision of compressed air components for 18 trainsets and bogies for 19 trainsets. The trainsets are of the ‘ALSTOM Coradia Lint 41 Series 3’ type.
The first of 13 sets of compressed air components and the first 14 sets of bogies will undergo revision in the period 01.01.2024 – 30.04.2026. The last compressed air components and bogies will undergo revision in the period 01.04.2029 – 31.12.2029.
-
The negotiations are expected to be conducted as a process in which negotiations are conducted on improvements and specifications based on the Tenderer’s preliminary tender as well as the possibility of optimising the tender documents.
The Contracting Authority reserves the right to accept the preliminary tender, in which case the Contracting Authority will perform a tender evaluation in accordance with Tender Conditions clause 5.
The Contracting Authority reserves the right to extend the negotiations so that the procedure comprises of more than one round of negotiations. The Contracting Authority will notify the tenderers about any such further procedure(s).
No compensation will be paid to Applicants and Tenderers for the preparation of application and tender documents as well as time used throughout the negotiation process in connection with the prequalification or tender phase.