Expansion of the A 1 between the AS Köln-Niehl and the AK Leverkusen-West, especially replacement of the Rhine bridge Leverkusen (foreshore and current bridge) in the direction of Dortmund including demolition of existing structure.
- Demolition and new construction of the foreshore bridge as a prestressed concrete construction,
- Demolition and new construction of the river bridge as a steel composite and steel structure, supporting system cable-stayed bridge,
- demolition of a transformer building including technical equipment,
- Earthworks, shoring, drainage and bit. Ceiling construction for the above-mentioned structural components,
- earthworks and waterproofing works in the area of the former Dhünnaue landfill under the conditions of the emission protection concept,
- other services.
Expansion of the A 1 between the AS Köln-Niehl and the AK Leverkusen-West, especially replacement of the Rhine bridge Leverkusen (foreshore and current bridge) in the direction of Dortmund including demolition of existing structure.
- Demolition and new construction of the foreshore bridge as a prestressed concrete construction,
- Demolition and new construction of the river bridge as a steel composite and steel structure, supporting system cable-stayed bridge,
- demolition of a transformer building including technical equipment,
- Earthworks, shoring, drainage and bit. Ceiling construction for the above-mentioned structural components,
- earthworks and waterproofing works in the area of the former Dhünnaue landfill under the conditions of the emission protection concept,
- other services.