The Erfurter Bahn GmbH awards i. A. Süd-Thüringen-Bahn GmbH Construction work for the construction of a new service workshop in Meiningen; Building plot: Berliner Str. 2a. Here the construction of a petrol station and waste disposal facility.
Scope:
- approx. 450 m³ earthwork for the pipeline laying,
- 9 m
- 10 running meters of concrete sloping channels,
- 10 steel protection tubes for crossing tracks,
- 180 running meters of ELT empty pipes,
- 70 m PE cables with ELT welding sleeves,
- 56 m PE sewage pipes, double-walled diesel pipes 90 m DN 80 and 70 m DN 50,
- 2 x 50,000 l above-ground diesel tank containers with accessories,
- 2 x petrol pumps verifiable 150 l / min + substructure and 1x car diesel dispenser 50 l / min + substructure, tank data acquisition system,
- 8 m splash guard as a metal construction, supply and disposal station: waste water disposal and drinking water supply module in cabinet design with pump and automatic hose retraction, sink extension and shelf extension gray water lifting system + multi-station T-system (EBA hygiene approved)
- stationary wastewater disposal and drinking water supply module for passenger coaches with automatic hose retraction + corresponding foundation brackets,
- 150 m WHG joints 2k polysulfide as a complete service, commissioning, instruction, expert examination, documentation.