District heating conversion to Melby
Halsnæs Varme plans to supply district heating in Melby. The project concerns the establishment of a transmission line, distribution network, service lines, meters and stopcocks as well as a pumping station. The establishment of district heating includes the following:
a) Connection point on Havnevej
b) An approximately 3.1 km long transmission line from Frederiksværk to Melby, which runs parallel to the line and across the existing landowner's plots.
(c) A pumping station with a forward and return pump
d) One approx. 4 km. Distribution network in Melby
District heating conversion in Ølsted
Halsnæs Varme plans to supply district heating in Ølsted. The winning consultant will also be in charge of this project if regulatory approval and 50% connection to district heating are achieved in Ølsted. The client is working in the autumn of 2022 to obtain regulatory approval for district heating expansion to Ølsted and the tenderer must therefore expect to take over the project at the same level as the project in Melby.
District heating conversion to Melby
Halsnæs Varme plans to supply district heating in Melby. The project concerns the establishment of a transmission line, distribution network, service lines, meters and stopcocks as well as a pumping station. The establishment of district heating includes the following:
a) Connection point on Havnevej
b) An approximately 3.1 km long transmission line from Frederiksværk to Melby, which runs parallel to the line and across the existing landowner's plots.
(c) A pumping station with a forward and return pump
d) One approx. 4 km. Distribution network in Melby
District heating conversion in Ølsted
Halsnæs Varme plans to supply district heating in Ølsted. The winning consultant will also be in charge of this project if regulatory approval and 50% connection to district heating are achieved in Ølsted. The client is working in the autumn of 2022 to obtain regulatory approval for district heating expansion to Ølsted and the tenderer must therefore expect to take over the project at the same level as the project in Melby.