Since 2016, the Musik- und Kongresshalle (MuK) has been renovated in several construction phases. As part of the current construction phase 2.9 kitchen cubes, the commercial kitchen of MuK, including the adjacent rooms, will be gutted and rebuilt. The floor coverings in the basement are part of the tender.
— Remove 120 m
— 250 m
— fill 20 units of damage with filling putty,
— 40 m of cracks close with 2K grout,
— 50 m
— 50 m
— 50 m
— 75 m wooden skirting boards,
— 50 m bam protection.