General information on the assignment:
Borealt Transport Midt-Norge invite tenderers to an open tender competition for packing ballast track and points on the Gråkall tramway Further information on the procurement can be found in chapter 8.
About the contracting authority
Boreal Transport Midt-Norge AS is a public company with approx. 240 employees, and is operator of bus and rail. The company's operations include Gråkallbanen in Trondheim, which is the world's northernmost tramway line. The tracks extends from down town at 10 m above sea level to Lian at 240 m above sea level. The steepest climb is 40:1000 (4 %).
The purpose of the procurement:
The Gråkall tramway is an 8.8 km suburbian line in Trondheim The track's width is 1 000 mm. 7.2 km of the track goes on a separate route with flange rails fixed on wooden or concrete sleepers, lying on ballast gravel. Most of the ballast track is single track, with one crossing track of 850 metres and three crossing stations with double track. The ballast track shall be packed and adjusted in summer 2014. There are also 11 points on the stretch that shall be packed and adjusted. The total track length that shall be packed is 8 600 metres.