Heat insulated aluminum mullion-transom glass facade, doors and metal cladding
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Bathing hall: one floor and basement
Main building (foyer, changing rooms, sauna and administration): two-storey
Summer changing rooms: one floor and partial basement
Heat insulated aluminum mullion-transom glass facade, doors and metal cladding
• 740 m² aluminium mullion-transom glass façade with glass doors in mullion-transom façade
• Glass doors in solid construction or vestibule (sliding doors vestibule system)
• 46 m² metal facade cladding wind guard
• 24 opening wings, partly with motor
Performance dates:
Execution period: 12.10.2022 to 20.02.2023