Electrical engineering installation works | Tenderlake

Electrical engineering installation works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 July 2019
Closing Date:
26 August 2019
Location(s):
DE404 Potsdam, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Power installations and equipotential bonding VE301 - B1206G New construction of laboratory building A71 - GeoBioLab

For the construction of a new laboratory building with offices and server room, the electrical system is to be built from the middle voltage supply. To the extent of the plant belongs a transformer station which is to be integrated into the medium voltage ring of the AG.

Power installations and equipotential bonding VE301. The main low-voltage distribution system (NSHV) of the building is supplied via 2 outgoing panels, each with a hermetic oil transformer. The NSHV is divided into a part A and a part B by means of a coupling switch. From Part A, the supply of a centralized modular UPS system for the uninterruptible power supply of the server room and individual consumers takes place. The supply of the subdistributors for the supply of the individual floors (2.UG-3.OG) takes place alternately from part A or B of the NSHV. Cable laying for the power supply of the office and laboratory rooms mainly takes place via cable routes and channels. In order to reduce the formation of harmful flue gases, halogen-free cables are generally used for the installation. For the offices media columns are provided for receiving the installation equipment. In the laboratory rooms, only the connection cables for the separate sub-distribution boards are installed in the laboratory lines.

The lighting system is divided into a general and safety lighting system. As light sources LED lights are used in all areas. A group battery system is provided for the emergency lighting. The lighting is controlled mainly by the building automation. Only for technical rooms and toilets switches and presence detectors are provided. For the power distribution in the server room, busbars with corresponding tap-off units are to be installed for connecting the server cabinets and LCPs.

For part of the technical rooms, a double floor is to be built.

Medium voltage switchgear:

5 pc. Circuit breaker panel L2 without KU capability 1 pc. Busbar longitudinal coupling panel V2 with circuit breaker 2 pc. Oil transformer 10 kV, 1 600 kVA 75 m 2 Raised floor / control room floor own electricity supply system:

3 pcs. UPS system, converter cabinet, max. Equipment 200 kVA 1 pc. UPS battery system, consisting of 5 battery strings with 40 each 12V blocks 270 m Special rubber cable NSGAFÖ 1 x 95 1 224 m Heavy rubber hose H07ZZ-F 1 x 95 320 m Heavy rubber hose H07ZZ-F 1 x 240 low-voltage switchgear:

3 pc. Supply panel for 3-pole open circuit breaker 3 pc. Outgoing panel for 3-pole open circuit breaker 5 pc. Outgoing panel in universal installation technology, fixed installation 60 m busbars 2 500 A 110 m busbars 250 A 6 pc. Energy-saving switchgear and control cabinet with 15 pcs Active energy meter Kl.1 One-time meter 3 x 230/400 VAC 190 St. RCBO type A undelayed 16A Residual current 30 mA 52 pc. Power distribution bus 250 A 22PLE 10 300 m Installation cable halogen-free NHMH-J 3 x 2.5 RE prev. Cable tray / duct 2,750 m Installation cable halogen-free NHMH-J 5 x 6 RE prev. Cable tray / duct 250 m cable halogen-free N2XCH 4 x 120 SM / 70 existing cable tray / channel 370 m cable tray steel strip galvanized. H 100 mm W 300 mm 50 m Wide span cable tray steel band. H 100 mm W 500 mm 55 m Wide span cable tray steel band. H 100 mm W 600 mm 24 ea. Suspension construction for long-span troughs 400 pcs. Stem outrigger Steel up to 2 kN L up to 1 000 mm 62 pcs. Fire protection insulation Management systems MW-Pl.Schott S90 50 m 2 Fire protection clothing Cable route I90 Lighting systems:

135 pcs. Recessed luminaire 54 W surface-mounted clear 107 pcs. Pendant luminaire LED 68 W 174 pcs. Recessed light channel 1 200 mm 6 pcs. Central power supply system LPS 1h consumer power 57 pcs Rescue luminaire disc luminaire without frame Detection range 22 m 74 pcs Safety luminaire Continuous / standby circuit Ceiling surface IP40 potential equalization:

1200 m plastic core cable halogen-free H07Z-K 1 x 6 500 m plastic core cable halogen-free H07Z-K 1 x 25.

Download full details as .pdf
The Buyer:
Helmholtz-Zentrum Potsdam, Deutsches GeoForschungsZentrum GFZ – Vergabestelle
CPV Code(s):
45315100 - Electrical engineering installation works