New construction of 5 nursery and 4 kindergarten groups with 9 staff apartments
Kitchen system for a defrosting/heating kitchen for 4 kindergarten groups and 5 crèche groups with corresponding work/preparation areas
-Refrigerators/freezers 4 pieces
-Thermoport 2 pieces
-Work cabinets 4 pieces
-Combi-Damper 1 piece
-Electric stove 1 piece
-Microwave 1 piece
-Slide-through dishwasher 1 piece
-Drawer block 4 pieces
-Serving trolley 4 pieces
Construction period: 22.01.2024 to 16.02.2024