he work consists of:
- installation of thermal insulation from the outside + renovation of facades,
- replacement of exterior joinery with roller shutters,
- implementation of Controlled Mechanical Ventilation,
- clogging of natural ventilation in facades,
- installation of thermal insulation from the inside of the floor undersides (option),
- replacement of all radiators including thermostatic valves (option),
- Replacement of landing doors,
- installation of a heated towel rail in the bathroom (option),
- replacement of garage doors,
- implementation of an intercom and badge access system,
- embellishment of common areas (tiles, paintings, mailbox, integrated spotlights on
LED presence detection, ...),
- the compliance of the electricity of the dwellings and common areas
PVC facades and joinery (RGE company required)The works consist of:
- installation of thermal insulation from the outside + renovation of facades,
- replacement of exterior joinery with roller shutters,
Extended structural work (EGR company required)The works consist of:
- Replacement of landing doors,
- embellishment of common areas (tiles, mailbox)
HEATING / PLUMBINGThe works consist of:
- replacement of all radiators including thermostatic valves (option),
- installation of a heated towel rail in the bathroom (option),
vmc (EGR company required)The works consist of:
- implementation of Controlled Mechanical Ventilation,
electricityThe works consist of:
- implementation of an intercom and badge access system,
- beautification of common areas (integrated spotlights on
LED presence detection, ...),
- the compliance of the electricity of the dwellings and common areas
Paints / Flexible floorsThe works consist of:
- embellishment of common areas (paintings)
LocksmithThe works consist of:
- replacement of garage doors,