Drywall work as part of the renovation and conversion of a school building
As part of the renovation and partial conversion of a school building from the 1970s, manufactured in large panel construction, not basement, 4 full floors, as well as a largely free-standing building with a swimming pool system, manufactured in conventional construction, basement, 1 full floor, the following construction services are awarded in public tender:
- drywall work
The execution of the drywall work includes, among other things:
House B EG-3. OG
- Drywall building board type A/H2 thickness 75mm 30 m2
- Drywall, building board type A/H2, thickness 125mm, 860 m2
- Drywall building board type A/H2 thickness 150mm 27 m2
- Drywall building board type A/H2 thickness 250mm 165 m2
- Drywall, building board type A/H2, thickness 400mm, 36 m2
- Shaft walls type A/H2 thickness 75 mm 500 m2
- Impregnated building board type H2 180m2
- Fire protection panel type DF 125 m2
- Akustikdeckensystem 1900 m2
- cantilevered ceiling fire protection panel type DF 700 m2
- Suspended ceiling gypsum board building board type A/H2 400 m2
- Partition wall system WC 20 pieces
Therapy bath on the ground floor
- Dismantling/disposal of shaft walls type A/H2 thickness 75 mm 50 m2
- Dismantling/disposal of suspended ceiling gypsum boards building board type A/H2 300 m2
- Drywall building board type A/H2 thickness 125mm 30 m2
- Shaft walls type A/H2 thickness 75 mm 60 m2
- Akustikdeckensystem 150 m2
- Acoustic cladding swimming pool 30 m2