Conversion of main distributor for final condition / dismantling of temporary arrangements,
Vacuum spray tube degassing and autom. Replenishment,
Heating pipelines stainless steel pipe grouted approx. 1900 m,
Radiators – installation only: heating walls 8 pcs / convectors – 11 pcs / panel radiators 94 pcs.
Conversion of main distributor for final condition / dismantling of temporary arrangements,
Vacuum spray tube degassing and autom. Replenishment,
Heating pipelines stainless steel pipe grouted approx. 1900 m,
Radiators – installation only: heating walls 8 pcs / convectors – 11 pcs / panel radiators 94 pcs.