Outside facilities house 52 + 53.
To prepare:
- Demolition of strip foundations, concrete slabs: 60.00 m
- Removal of soil and building rubble mixture: 58.00 m
- Removal and reinstallation of compressible material: 84.00 m
Fixed surfaces:
- Pavement pavement, granite, stone format 6/8: 191.50 m
- Paving slab yard area, granite, stone format 8/10: 51.00 m
- Waterbound path: 128.00 m
- Incl. Drainage channels and yard inlets.
Construct:
- Retaining wall made of concrete support angles (prefabricated parts): 19 m;
- Incl. armored strip foundation;
- Wire mesh baskets (gabions): 10 m.
Enclosures and other:
- Chainlink fence including posts (H 0.8 m): 10 m.
Planting and sowing:
- Perennial area: 38.00 m
- Wooded area: 30.00 m
- Landscape and flowering lawns: 310.00 m
- Gravel lawn: 51.00 m
- Supply and plant deciduous trees HSt. 18-20 cm: 2 pc .;
- Tree restoration, mycorrhiza treatment: 2 hours;
- Crown care cut: 2 pieces