this first consultation of the companies concerns a first phase of work commissioned by the control group between the Cabb and the Syndic of co-ownership of the consular building, and comprising:- for the Cabb, the complete renovation of the Bouchet room, the sound system of the Bouchet and Escande rooms, the enclosure and cover of the extension of the Roncier room with the creation of an emergency exit and installation of a freight elevator; - for the Syndic, repairing the waterproofing of flat roofs, replacing elevators and deconstruction/construction of an emergency staircase. Funding: Equity, Nouvelle Aquitaine region, Corrèze Departmental Council
lot no1- desamiantageasbestos removal prior to the extension of the Roncier room
Lot No. 11 - ElevatorsRefurbishment of existing elevators, equipment of a freight elevator and a disabled lift
lot no12- heating cooling ventilationDeposits, moves and installs technical equipment on flat roofs
lot no. 14 - Electricity / Low currents / High currentssecurity lighting, sound and video of the Bouchet and Escande rooms
lot no. 2- demolition / structural workdemolition of the exterior emergency staircase on the north façade, an emergency metal staircase foundation, demolitions for the extension of the Roncier room
lot no. 3 - metal frameMetal frame for extension of the Roncier room
Lot 4- Sealingrepair of the waterproofing of the existing roof terraces and realization of the waterproofed roof of the extension of the Roncier room
lot no. 5- metal claddingcladding of the extension of the Roncier room
lot no6-locksmith/metalworkemergency staircase, passageway, pylon and lift covering, various metalwork
lot no. 7- aluminum carpentrymodification of the Bouchet room, emergency exit and joinery of the extension of the Roncier room
lot no9- platrerie Peinture Nettoyage (Salle Bouchet)Restoration of the paintings in the Salle Bouchet
lot 10: Floor coverings (Bouchet room)replacement of the carpet in the Bouchet room