The construction project is the replacement of the Schillerschule in Bürstadt. The Schillerschule is a primary school with about 600 pupils. On a GFA of approx. 7,500 m² on 3 full floors, 24 classrooms, multi-purpose and care rooms as well as the school administration, as well as technical rooms are being built. The building will be built in solid construction, mainly in reinforced concrete and masonry, with a flat sloping roof / flat roof and has a gross volume of approx. 31,700 m³. During the construction period, school operations and administration will be outsourced to a container module facility.
The services to be commissioned here include metal construction work in accordance with DIN 18 360 with the following scope:
- 90 running metres stair railing
- 35 running metres platform railing
- 90 m ceiling frame
- 90 running metres of temporary construction railing
- 90 running metres all-glass balustrade/gallery railing
- 12 running metres of side guardrails with ballast
- 1 piece of steel staircase for roof hatch
Metallbauarbeiten