- 4 ventilation systems with heat recovery, with measuring and control technology 2,000-3,000 m
- 1 ventilation system with heat recovery and cooling - 10 000 m
- 4 pieces of waste air systems each 2,000 m
- 5 underground car park exhaust air systems - 8,000-9,000 m
- 1 pc cooling system - split system 160 kW cooling capacity, with measurement and control technology,
- 4 direct evaporators - small refrigeration system with 5-10 kW each, with outdoor and indoor units,
- 1 700 m
- 2,380 m
- 200 m
- 250 m galvanized spiral pipes DN 100-DN 200,
- 560 m galvanized spiral pipes DN 100-DN 250,
- 322 volume stabilizers,
- 245 pcs air outlets,
- 165 pcs of telephone soundproofing DN 100-DN 200,
- 100 fire dampers round and square,
- 540 m cold piping DN 15-DN 100, black, with corrosion protection, DIN EN10255 and DIN EN10216-1,
- 650 m stainless steel pipe - press fitting, DIN 17455 - Cr. N. Steel 1.441.
- 4 ventilation systems with heat recovery, with measuring and control technology 2,000-3,000 m
- 1 ventilation system with heat recovery and cooling - 10 000 m
- 4 pieces of waste air systems each 2,000 m
- 5 underground car park exhaust air systems - 8,000-9,000 m
- 1 pc cooling system - split system 160 kW cooling capacity, with measurement and control technology,
- 4 direct evaporators - small refrigeration system with 5-10 kW each, with outdoor and indoor units,
- 1 700 m
- 2,380 m
- 200 m
- 250 m galvanized spiral pipes DN 100-DN 200,
- 560 m galvanized spiral pipes DN 100-DN 250,
- 322 volume stabilizers,
- 245 pcs air outlets,
- 165 pcs of telephone soundproofing DN 100-DN 200,
- 100 fire dampers round and square,
- 540 m cold piping DN 15-DN 100, black, with corrosion protection, DIN EN10255 and DIN EN10216-1,
- 650 m stainless steel pipe - press fitting, DIN 17455 - Cr. N. Steel 1.441.