1. The subject of the investment is the extension of the voivodship road No. 820 from km 0+000 to km 19+050" along with the construction and extension of engineering structures and the protection or expansion of external equipment colliding with the road under construction and engineering structures.
2. The design documentation is adapted to the identified needs of persons with disabilities and
Consistent with the concept of universal design.
I. The scope of the planned investment includes the following industry works:
A. ROAD INDUSTRY
Preparatory Works
EARTHWORKS
SUBSTRUCTURE
PAVEMENTS
FINISHING WORKS
ROAD SIGNAGE AND TRAFFIC SAFETY EQUIPMENT
ELEMENTS OF STREETS
ROAD GREENERY
OTHER ROBOTS
B. INDUSTRY ENGINEERING FACILITIES
SMALL BRIDGE MM-1
MD-1 BRIDGE (DEMOLITION OF THE EXISTING M.
BUSHINGS PRZ-1 ÷ PRZ-13
CULVERTS UNDER SUBORDINATE ROADS
DEMOLITION P-1R÷P-9R
C. SANITARY INDUSTRY
C.1 RAINWATER DRAINAGE
C.3 WATER SUPPLY
D. ELECTRICAL INDUSTRY
ROAD SYSTEM LIGHTING AND POWER SUPPLY FOR ACTIVE ROAD SIGNS
RECONSTRUCTION OF THE POWER GRID
E. TELETECHNICAL INDUSTRY
RECONSTRUCTION OF ORANGE POLSKA S.A. INFRASTRUCTURE
3. As part of the information and promotion of European Funds for Eastern Polish for the years 2021-2027, the Contractor is obliged to mark documents and materials related to the implementation of the project and to make and set up information boards for the construction of the pcs. 2 (double-sided) and commemorative plaques after the completion of the construction pcs. 2 (bilateral) according to the rules set out in the "Handbook of the applicant and beneficiary of European Funds for 2021-2027 in the field of information and promotion" and the "Book of Visual Identity of the European Funds 2021-2027 brand".
II. The contracting authority provides for contracts referred to in Article 214(1)(7) of the Public Procurement Law for a net value not exceeding PLN 3,252,032.52. The contract may be awarded on the road covered by the scope of the basic contract.
The scope of the contract will include: preparation works, grubbing up trees and shrubs, demolition of road and street elements, excavations and embankments, execution of substructures, reinforcement of the ground substrate, execution of the surface of crushed aggregate, construction of pavement surfaces and roundabout rings, execution of bituminous layers and road surface, bicycle path / pedestrian and bicycle route, surface and construction of the weighing station, laying of a geocomposite, strengthening of slopes and ditches, construction of exits, construction of street elements, rearranging small architecture objects, execution of animal protection devices, execution of other works, construction of a bridge with object works and culverts under the crown of the road and exits, implementation of horizontal and vertical markings and BRD devices, tidying up the area, execution of drainage of the road body with the construction of tanks with a fence and gates, finishing works, works related to the implementation of lighting, works related to the reconstruction and protection of power networks, teletechnical networks, storm water drainage, water supply networks and other networks.
Conditions under which contracts will be awarded similar:
Negotiations will be held during which the parties will determine the detailed scope of the contract, the deadline for the performance of the contract and the amount of remuneration,
The contractor for the basic contract shall perform it to the same standard as for the basic contract.
III. The contracting authority provides for the cancellation of the procedure under Article 257 of the Public Procurement Law if the funds from the Funds
European elections for Eastern Polish, which the Contracting Authority intended to allocate to finance the contract,
were not granted to him.
IV. The Contracting Authority shall provide for the requirements indicated in Article 95(1) in the scope of employment by the Contractor
or a subcontractor on the basis of an employment contract of persons performing the activities referred to in point
XXVI.1.SWZ in the scope of contract performance.
V. The contracting authority does not allow the possibility of submitting partial bids - detailed justification contained
is in SWZ.
VI.The contracting authority provides for partial payments in accordance with the provisions of the draft contract.