Ventilation system: ventilation unit with heat recovery (V = 13,000m³ / h) in the DG,
- approx. 450 m
- approx. 500 m
- 900 m spiral folded tube,
- 96 Zu-u. Exhaust air machines,
- 20 poppet valves,
- 200 different types of BSK.
Ventilation system: ventilation unit with heat recovery (V = 13 000 m³ / h) in the DG,
- approx. 450 m
- approx. 500 m
- 900 m spiral folded tube,
- 96 Zu-u. Exhaust air machines,
- 20 poppet valves,
- 200 different types of BSK.