Drinking-water treatment plant construction work | Tenderlake

Drinking-water treatment plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
26 March 2021
Closing Date:
23 April 2021
Location(s):
FRG05 Vendée (FR FRANCE)
Description:
Design-build contract for the new Martyrs drinking water production plant in Saint-Laurent-sur-Sèvre

The purpose of this consultation is to design and build the new Martyrs drinking water production plant in the town of Saint-Laurent-sur-Sèvre. The project includes the construction of a pumping station, the laying of a raw water pipeline, the construction of the new Martyrs drinking water plant, as well as the complete demolition of the old plant. It will include two phases:

- phase 1: design;

- phase 2: realization.

The purpose of this consultation is to design and build the new Martyrs drinking water production plant in the town of Saint-Laurent-sur-Sèvre. The work program provides for:

- the construction of a new raw water intake in the Sèvre Nantaise;

- the construction of a new drinking water production plant on the Martyrs site;

- construction of a treated water storage tank;

- laying of connecting pipes for connecting raw water, dirty water, treated water;

- the filling of wells, boreholes and existing drainage galleries that are not reused;

- the deconstruction of the works of the existing martyrs factory;

- the site's exterior fittings: roads and various networks, fences and green spaces.

The new drinking water plant will be sized for an average production of 130 m 3 / h at a rate of 2,600 m 3 drinking water per day (20-hour operation).

Download full details as .pdf
The Buyer:
Vendée Eau
CPV Code(s):
45252126 - Drinking-water treatment plant construction work