New construction of a multifunctional hall and office wing.
1. Construction of a new multifunctional hall
Building cubature as a rectangular volume (with two fire compartments).
Edge length: approx. 12 m x 42 m
Bruttorauminhalt: approx. 52.600 m3
Gross floor area: approx. 5,210 m2
Building height OK attic: approx. 11.00 m I 12.40 m
2. New construction of an office wing.
Building cubature as a rectangular volume (with two fire compartments).
Edge length: approx. 21 m x 32m.
Bruttorauminhalt: approx. 11.700 m3
Gross floor area: approx. 2,685 m2.
Building height OK attic: approx. 18.00 m I 20.00 m
Start of construction of shell construction: August 2023
Start of raw installations for heating/cooling: May 2024
Completion of construction (overall) planned: end of 2024
Heating and refrigeration technology in general
Complete heating and cold water systems with sub-distributions.
Connection to district heating station provided by the customer.
Delivery and installation of pressure maintenance and sub-distributions with approx. 6 control loops.
Connection to existing air conditioning cold water supply in the basement Existing buildings on the site.
Delivery and installation of approx. 300m of buried supply lines in on-site trenches.
Heating and refrigeration technology multifunctional hall
Delivery and installation of heating circuit manifolds
Delivery and installation of refrigeration circuit manifolds
Delivery and installation of approx. 70 radiant ceiling panels for hall heating including all pipelines
Heating and refrigeration technology office wing
Delivery and installation of heating circuit manifolds
Delivery and installation of refrigeration circuit manifolds
Delivery and installation of approx. 165 radiators including all piping
Delivery and installation of approx. 65 circulating air cooling units including all piping