On the school grounds of Pater-Wilhelm-Fink-Strasse 18, an extension with a connecting corridor to the existing building is to be built. Screed work DIN 18336, 18353 Execution period: KW 40/2020 - KW 09/2021:
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure:
- 2 300 m
- 1 300 m