L486n, OU Kevelaer-Winnekendonk, earthworks and ceiling construction works on a distance of approx. 1780 m and new construction of a junction area.
approx. 13,910 m3 of topsoil removal
approx. 3,280 m³ of topsoil removal and storage, pick-up and covering
approx. 35,330 m² of soil improvement using binders
approx. 51 pcs. Installing settlement levels
produce approx. 10,600 m³ drainage layer
approx. 1,640 m of seepage line
approx. 40,670 m3 of soil for embankment filling and installation
approx. 1 corrugated steel profile, 6.04m wide, 3.62m high, 27.11m long
approx. 6,570 m3 of frost-resistant material and installation
approx. 13,342 m2 soil consolidation with hydraulic binders
ca. 12.400 m2 AC 32 T S
ca. 12.260 m2 AC 16 B S
ca. 3.350 m2 SMA 16 B S
ca. 3.350 m2 SMA 8 S
ca. 430 m2 AC 22 T N
ca. 430 m2 AC 8 D N
approx. 8 signal whip poles including booms