New indoor swimming pool in Moosburg ad Isar
Construction of an indoor pool:
BRI: 13,600 m3; GFA: 2,725 m 2nd
Pool: 12.50 mx 25 mx 1.80 m
- 250 m site fence;
- 70 weeks maintenance of the construction fence;
- 300 m 3 Allowance for the expansion of roads and paths;
- 3 500 m 3 Compacting in layers;
- 1,980 m 3 In-situ concrete strip foundation unreinforced;
- 300 m 3 In-situ concrete floor slab;
- 920 m 2 Formwork outer wall bent, H 3-4 m;
- 800 m 2 Inner wall formwork Large-area formwork GF formwork pl. H 3-4 m;
- 175 m 2 Masonry inner wall D 11.5 cm KS LR SFK12 RDK1.6 MGIIa.
painting work