L 73 BW 0003 Prosigker bridge over the DB AG in Köthen, replacement building (ASB 4237500A).
- BE / General:
- 600 m fence,
- 6 000 m
- 100 t asphalt base course,
- 3 000 m
- 3 000 m
Replacement L 73_0003- Prosigker bridge
- ordnance clearance:
- 210 m
- 35 500 m depth sounding,
- 34 000 m computerized borehole sounding,
- deliver 700 t of well dammers,
- 500 m
- 3 200 m
- 3 400 m
- deliver 3 600 tonnes of gravel / sand mixture,
- 2 700 m
- 4 600 t disposal of excavated material.
- bridge construction:
- make detailed drawings for replacement construction and all construction aid,
- establish stability certificate for replacement and construction aid,
- workshop planning steel construction and equipment,
- Statics + execution planning f.Abbruch- / Kranprojekt,
- construction drawings + stability analysis incl. Vibration measurements bridge,
- 4 400 m
- 820 m
- 1 900 m
- produce 9 200 m³ excavation pits,
- 2 100 m³ allowance for dredging,
- 1 800 m
- 1 800 m
- 9 000 m
- 650 m bored piles pile diameter. about 1.20 m,
- 680 m
- 780 m
- 2 600 m
- 790 t total steel construction of the bridge superstructure,
- 1 900 m bird repellents,
- 1 000 m
- 4 000 m
- Railway adaptation measures.