On the school grounds of Pater-Wilhelm-Fink-Straße 18, an extension is to be built with a connecting corridor to the existing building: Work: WC partition walls, DIN 18355 Execution period: KW 24/2021.
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure:
- 9 toilet cubicles;
- 1 St. pubic wall.