Total contractor service New sports hall Kaserne Donaueschingen
New construction of a sports hall with two-storey extension and a free-standing single-storey building, without outdoor facilities.
NRF (R) 1,859 m2 (sports hall room with 968m² play area and 7m room height as well as extension with fitness room, changing rooms, sanitary facilities, technical and traffic areas as well as buildings for outdoor equipment with bicycle roofing). BRIa approx. 16,000 m3.
Performance of the Contractor: Design and execution planning (with object planner, structural engineer, building automation, thermal building physics, sound insulation and room acoustics, surveying, daylight lighting technology, fire protection, etc.) as well as turnkey execution of the buildings on the basis of the preliminary planning of the client.
In principle, alternative system construction methods made of reinforced concrete, concrete, wood or hybrid construction methods can be realized. The degree of prefabrication of components can be selected by AN.
The construction site is located in the south of the Fürstenberg barracks Donaueschingen. The construction site will be outsourced from the barracks area during the construction project and will have its own construction site access. As a result, the construction site is located outside the barracks area for the construction period and there are no restrictions on organizational connections.
In addition, the award of 'maintenance services' is the subject of the procedure.