In the new building of the Max Planck Institute for Physics in Garching, laboratory and workshop areas are being realized in 2 separate construction phases. The laboratory and workshop buildings share a common basement, which does not, however, encompass the entire area of the two sections. The laboratory building is a 5-story building, while the workshop building is a 4-story building. Both buildings are connected by a walkway on the ground floor, 1st floor and 2nd floor. Apart from a few storage rooms in the basement, all laboratory and laboratory-associated facilities are located in the laboratory building
Production areas on one level on the ground floor with approx. 2,040 square meters. According to the use, the ground floor is divided as follows:
- Standard laboratories: physical-technical;
- Clean room areas: Manufacturing u. Research, chip / hybrid manufacturing (ISO 7);
- Special laboratories: laser, chemistry, cryostat;
- Manufacturing area: plant engineering;
- Manufacturing area: electronics.
The workshop building houses precision engineering and electrical engineering workshops from the ground floor to the second floor. The areas also have training workshops. There is also a large assembly hall that extends over all 3 above-ground floors.
2 fume cupboards and 1 hazardous materials workplace
14 safety cabinets
4 gas bottle safety cabinets
3 dec. High-purity gas networks with 200 m pipeline, 4 battery pressure reducers
approx. 120 laboratory tables (approx. 240 running meters)
approx. 30 electronics workstations
approx. 130 tall laboratory and workshop cabinets
4 laboratory basins
approx. 20 hand basins
Execution must be started: within 12 working days after receipt of the request by the client (Section 5 (2) sentence 2 VOB / B); the request is anticipated. to be received by December 18, 2020.
The service must be completed (ready for acceptance): within 230 working days of the deadline specified above for the start of work.
"Special note regarding bidder questions on the corona situation:
Please take into account any possible or discernible impairments caused by the Corona crisis when preparing your offer. B. in relation to the availability of materials and products, workers, a possibly delayed provision of required proof, effects on any subcontractors, etc.
We kindly ask you to ask questions that arise in this context in good time before the offer deadline via the eVergabe message system. Please also note Section 10.4 ff of the Additional Special Terms and Conditions (WBVB) of the MPG (as of April 2020). "
See II.1.4)