Installation of water and sewage systems, water treatment, shower systems, gas system, sanitary equipment
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Here especially the LOS 2 for the component A-D main building and course pool
A prior information notice was published on 19.08.2022 about Ted throughout Europe, which serves to shorten the deadline for the receipt of the offers.
Main building Renovation and extension: Two-storey and partial basement
New course pool: single-storey with basement
Wastewater and rainwater
• Approx. 670 m highly sound-insulated sewage pipe PE D 56 – 160 incl. fittings and fittings and fire protection
• Approx. 100 m more sound-optimized drainage system with plug-in sleeve DN 50 – DN 125 incl. moldings and connectors and fire protection
• Approx. 115 floor drains DN 70 & 100
• Approx. 13 drainage channels V4A from 2.2 m – 24 m
• Approx. 170 m hot-dip galvanized dewatering steel pipe DN 100 – DN 125 incl. fittings and fittings for rain drainage
• Approx. 45 flat roof drains of different dimensions and designs
Drinking water
• Approx. 1,400 m drinking water pipe PE-100 DN 25-125 incl. fittings and fittings, fire protection and insulation
• Approx. 2,000 m drinking water pipe multilayer composite 100 DN 12-50 incl. fittings and fittings, fire protection and insulation
• Div. Trinkwasserarmaturen
• Ca. 16 Hygienespülstationen
• 1 demineralized water system, 1 pressure booster system
• Approx. 3 pcs.. Disabled toilet incl. installation elements and accessories
• Approx. 17 toilets incl. installation elements and accessories, zus. Urinals and washbasins
• Several row shower systems with 44 shower heads in total
• Ca. 8 Erlebnisduschen
Gas systems
• Approx. 250 m gas pipe stainless steel DN 15-65 incl. fittings and fittings
• Various gas fittings and meters
Performance dates:
Execution period: December 2022 to May 2024
Completion of new opening 01.06.2024