Operation of the drinking water production service on 10 production units, 5 reservoirs, 24.3 km of supply pipelines (for information, in 2017, a product volume of 2 402 993 m 3 ). The assets on the perimeter of Sérent-Lizio will not be integrated until 1.1.2022.