The subject of the contract is the design and construction of the S8 Wrocław – Kłodzko expressway, task 1 from the Kobierzyce Północ junction (with the interchange) to the Kobierzyce Południe junction (with the interchange) with a length of approx. 7.5 km, from km approx. 115+344 to km approx. 122+896. The above section is a part of the road connection between Wrocław and Kłodzko, and is located in the Lower Silesian Voivodeship, in the Wrocław poviat, in the Kobierzyce commune.
The subject of the contract is the design and construction of the S8 Wrocław – Kłodzko expressway, task 1 from the Kobierzyce Północ junction (with the interchange) to the Kobierzyce Południe junction (with the interchange) with a length of approx. 7.5 km, from km approx. 115+344 to km approx. 122+896.
The above section is a part of the road connection between Wrocław and Kłodzko, and is located in the Lower Silesian Voivodeship, in the Wrocław poviat, in the Kobierzyce commune.
It is necessary to carry out all necessary design studies, obtain on behalf of and on behalf of the Ordering Party the necessary opinions and technical conditions, all arrangements, permits, permits, decisions and consents necessary for the performance of the Contract in accordance with the Requirements of the Ordering Party and the Conditions of the Contract, perform construction works and obtain in the name and on behalf of the Ordering Party decisions on the occupancy permit for the entire scope of the investment. The scope of key tasks separated for personal performance includes the surface of the main route, including the manufacture and incorporation and the execution of other layers of the surface structure above the native soil (excavation) or embankment (embankment), excluding the supply of materials and services. Order value above EUR 20 million.