The order is divided into two tasks:
Task I: the execution of design documentation with the supervision of the implementation of assembly works, the delivery of equipment, the execution of construction and assembly work, the commissioning and carrying out of the procedure for the inclusion in the OSD network of photovoltaic microinstallations. Installations with a total capacity of a minimum of 430.36 kWp (0.43036 MWe) — a total of 104 objects.
Tasks II: the execution of design documentation together with the supervision of the implementation of assembly works, the execution of construction and assembly works, the delivery of equipment, the installation of solar collectors. Installations with a total capacity of a minimum of 67,750 kW (0.06775 MWe) — a total of 19 facilities.
Renewable energy sources in Gaszowice Municipality - Task I concerns photovoltaic installationsThe object of the order for Task I is the execution of design documentation (for each object a separate project) together with the supervision of the implementation of assembly works, the delivery of equipment, the execution of construction and assembly work, the commissioning and carrying out of the procedure for inclusion in the network OSD of PV microinstallations, including conducting instruction for facility users in the field of installation handling and servicing of installations during warranty and warranty period. Installations with a total capacity of a minimum of 430,36 kWp (0,43036 MWe) will be located on private properties owned by residents of Gaszowice Municipality — a total of 104 objects:
- with a minimum capacity of 2.24 kWp — 5 pcs of installation
- with a minimum capacity of 3.36 kWp — 24 pcs of installation
- with a minimum capacity of 3.92 kWp — 13 pcs of installation
- with a minimum capacity of 4.20 kWp — 1 piece of installation
- with a minimum power of 4.48 kWp — 25 pcs of installation
- with a minimum power of 4.76 kWp — 36 pcs of installation
Renewable energy sources in Gaszowice Municipality - Task II concerns the installation of solar collectorsThe object of the order for Task II is the execution of design documentation (for each object a separate project) together with the fulfillment of authorial supervision of the implementation of assembly works, the execution of construction and assembly works, the supply of equipment, the installation of solar collectors together with instructing facility users in the field of installation handling and servicing the installation during the warranty and warranty period. Installations with a total capacity of a minimum of 67,750 kW (0.06775 MWe) will be located on private properties owned by residents of Gaszowice Municipality — a total of 19 structures:
- number of plates of collectors — 2 pcs. — 10 pcs of installation
- number of plates of collectors — 3 pcs. — 6 pcs of installation
- number of plates of collectors — 4 pcs. — 3 pcs of installation