Groundwater monitoring in the area of the Schwarze Pumpe Industrial Park
- Participation in the voting date for the briefing and coordination of the work (2022)
- taking water samples from groundwater monitoring points, determining water levels before sampling, determining the oil phase, for the cut-off date measurement, the water levels must be determined and the depth of the groundwater measuring points piloted out
- Special features that are detected at the GW measuring points during sampling or the cut-off date measurement must be documented in the sampling protocols (damage, missing labels, deviations in the expansion compared to the master data, etc.)
- Taking water samples from rivers: Ditch A and E, Mühlgraben and Spree,
- Monthly measurement of flows in trenches A and E
- physicochemical analyses of water samples from groundwater measuring points and surface water measuring points, transfer of the results printed as reports and on data carriers, digital data acquisition
- A total of about 10 blank samples per year are to be taken from groundwater measuring points specified by the working group and analyzed for BTEX and alkylphenols.